INDUSTRIAL

 

Al Ayam Printing Press Building, Janabiya
Installation / Service Work:

  • Electrical, Plumbing, Firefighting, LPG, Compressed air system
  • LV (LV Panels, Cable Tray/ cables Bus bar installation)
  • ELV (Fire alarm, PA system, Access control system)
  • Total connected load – 3.2 MV
  • Plumbing & LPG & Fire fighting system (Sprinkler, Wet riser & Hose reel system)

 

Garment Factory, Mameer
Installation / Service Work:

  • Electrical
  • LV & ELV (Fire alarm, PA system, Access control system)
  • Total connected load – 800 KW

 

RUF Automobile Assembly Complex, Bahrain International Circuit (BIC), Sakhir
Installation / Service Work:

  • MEP
  • 400TR Chilled Water Central Plant, Ventilation & BMS
  • HV, HV Switch Gears , Transformers
  • LV (LV Panels, Cable Tray / cables Bus bar installation)
  • ELV (Fire alarm, PA system, Access control system)
  • Total connected load – 5.5 MV
  • Plumbing & Firefighting system (Centralized solar hot water system, Sprinkler, Wet riser & Hose reel system)

 

Jeeves Laundry, Hamala
Installation / Service Work:

  • MEP
  • 80TR Ducted splits of various capacities
  • LV & ELV (Fire alarm, PA system, Access control system)

 

MTQ Oil Field Services, Hidd
Installation / Service Work:

  • HVAC
  • 100TR VRF units, 50 TR ducted split units, 9 nos. of Roof mounted adiabatic ventilation system & Building Management system

 

Alba, Sitra
Installation / Service Work:

  • Air conditioning
  • 90 TR ducted split units, ventilation system
  • 120 TR Ducted Split units, Ventilation system

 

LSDP BAPCO, Awali
Installation / Service Work:

  • Air conditioning & Electrical
  • 400 TR chilled water central plant, Building Management system

 

KFH Industrial Oasis, Hidd
Installation / Service Work on infrastructure:

  • MEP
  • HV, HV Switch Gears, Transformers
  • LV (LV Panels, Cable Tray/ cables, Bus bar installation)
  • ELV (Fire alarm)

 

Glass Factory, Hidd
Installation / Service Work:

  • HVAC

 

Caterpillar Facility, Sanad
Installation / Service Work:

  • HVAC & Plumbing
  • 130 TR Packaged AC units

 

PWC Warehouse, Hidd
Installation / Service Work:

  • Plumbing & Fire fighting system (Sprinkler, Wet riser & Hose reel system)

 

KFH Industrial Oasis, Hidd
Installation / Service Work:

  • MEP
  • Transformer installation, LV, HV & ELV (Fire alarm, PA system, Access control system)
  • Total connected load – 4.5 MV

 

  Almoayyed Contracting